Vapors Technology Bench Scale Testing
This pilot-scale test has concluded and the reports from the pilot program are below the description of the pilot-scale testing purpose.
Evolution of an Emergency Response
The pilot-scale testing of equipment at A and AP Tank Farms to demonstrate the recommended technologies in the field at potential source locations, the work zone, and the tank farm fence line. The Vapor Monitoring & Detection System, or VMDS, is comprised of numerous detection systems with an overarching data acquisition system. In order to prove the system can monitor and detect potentially hazardous conditions, the instruments need to detect released vapors, transmit the data to the data acquisition system, and provide real-time meteorological conditions within a specified area. [Technology Maturation Plan for the Tank Farm Vapors Monitoring and Detection System (RPP-PLAN_59972, Rev. 0)]
As part of ongoing efforts to better understand and manage chemical vapor emissions, and potential worker exposures, the Hanford Tank Operations Contractor—Washington River Protection Solutions (WRPS)— plans to deploy a vapor monitoring and detection system (VMDS) in the tank farms located in the 200W and 200E areas of the Hanford site. WRPS has evaluated the technical maturity of several vapor sensing technologies that make up the VMDS. Before committing to deployment of the VMDS, WRPS planned and executed bench-scale tests of the prototype system. The bench-scale tests were designed to provide input to the configuration and methodology of a pilot-scale test. Read more...
The Location
The location of sensors and samplers at the tank farms include comprehensive coverage close to the primary sources, a more random location of sensors that will cover the tank farms, and locations outside of the boundaries of the tank farms. The data will reveal the source and transport of the vapors and detect non-tank farm sources of vapors if they are present.
Data
Data will be evaluated and correlated to determine the utility of each piece of equipment as well as collecting information on location, speciation, and concentration of vapors in the tank farms. Once the data is collected from the sensors and laboratory sampling, it will be compared to the results of other co-located sensors to corroborate the response from each type of sensor. Note: as this is a pilot-scale test, reports are subject to change as new information becomes available.
This pilot test has concluded and the reports from the pilot program are below.
DRI Weekly Report (Sept. 21-28, 2016)
DRI Weekly Report (Oct. 5-12, 2016)
DRI Weekly Report (Oct. 12-19, 2016)
DRI Weekly Report (Oct. 19-26, 2016)
DRI Weekly Report (Oct. 26-Nov. 2, 2016)
DRI Weekly Report (Nov. 2-9, 2016)
DRI Weekly Report (Nov. 9-16, 2016)
DRI Weekly Report (Nov. 16-23, 2016)
DRI Weekly Report (Nov. 23-30, 2016)
DRI Weekly Report (Nov. 30-Dec. 7, 2016)
DRI Weekly Report (Dec. 7-14, 2016)
DRI Weekly Report (Dec. 14-21, 2016)
DRI Weekly Report (Dec. 21-28, 2016)
DRI Weekly Report (Dec. 28, 2016-Jan. 4, 2017)
DRI Weekly Report (Jan. 4-11, 2017)
DRI Weekly Report (Jan. 11-18, 2017)
UV-DOAS Weekly Report (Sept. 21-28, 2016)
UV-DOAS Weekly Report (Oct. 5-12, 2016)
UV-DOAS Weekly Report (Oct. 12-19, 2016)
UV-DOAS Weekly Report (Oct. 19-26, 2016)
UV-DOAS Weekly Report (Oct. 26-Nov. 2, 2016)
UV-DOAS Weekly Report (Nov. 2-9, 2016)
UV-DOAS Weekly Report (Nov. 9-16, 2016)
UV-DOAS Weekly Report (Nov. 16-23, 2016)
UV-DOAS Weekly Report (Nov. 23-30, 2016)
UV-DOAS Weekly Report (Nov. 30-Dec. 7, 2016)
UV-DOAS Weekly Report (Dec. 7-14, 2016)
UV-DOAS Weekly Report (Dec. 14-21, 2016)
UV-DOAS Weekly Report (Dec. 28, 2016-Jan. 4, 2017)
UV-DOAS Weekly Report (Jan. 4-11, 2017)
UV-DOAS Weekly Report (Jan. 11-18, 2017)
OP-FTIR Weekly Report (Sept. 21-28, 2016)
OP-FTIR Weekly Report (Oct. 5-12, 2016)
OP-FTIR Weekly Report (Oct. 12-19, 2016)
OP-FTIR Weekly Report (Oct. 19-26, 2016)
OP-FTIR Weekly Report (Oct. 26-Nov. 2, 2016)
OP-FTIR Weekly Report (Nov. 2-9, 2016)
OP-FTIR Weekly Report (Nov. 9-16, 2016)
OP-FTIR Weekly Report (Nov. 16-23, 2016)
OP-FTIR Weekly Report (Nov. 23-30, 2016)
OP-FTIR Weekly Report (Dec. 14-21, 2016)
OP-FTIR Weekly Report (Dec. 28, 2016-Jan. 4, 2017)
OP-FTIR Weekly Report (Jan. 4-11, 2017)
OP-FTIR Weekly Report (Jan. 11-18, 2017)